Applications

 

Scour Mitigation Erosion Mitigation
Bank Stabilisation Bridge Scour Protection
Pylon Protection Artificial reefs
Underwater cables Pipeline protection

 

 

Standard
Application Illustration Note Example
River Bank Protection The bag is used at the front of bank independently as foot protection. The installation methods are step piling and random piling.
Foot Protection Filter Unit is installed on the riverbed. In order to construct it without gaps, small size fillings are recommended.
River Dike Protection Step pilling applies at a slope which becomes 1:2 or less(steep).
Level installation applies at a slope which becomes more than 1:2 (loose).
Riverbed Protection Filter Unit is installed on the riverbed. In order to construct it without gap, small size fillings are recommended.
Other
Application Illustration Note Example
Over Block Filter Unit is used on foot protection blocks. It may be used as a vegetation base with earth covering.
Under Block By using it under a foot protection block or a covering stone, an upside structure is stabilized from subsidence by sucking etc.
With Other
Construction
Filter Unit installed in wooden pile or other methods of construction at inside, back and forth. The cooperation effect with other methods of construction is expected.
Protection Of Front Part Bank protection etc. are stabilized by installing the bag in the fronts, such as gabion, sandbag and a sheet pile.
Emergency Procedure Filter unit is installed at a disaster place and erosion is prevented. An additional injection is possible because it has good flexibility.
Temporary Road To avoid damage of Filter Unit by passing heavy construction machine directly on Filter Units, please install steel plate on the top.
Filter Unit With Gabion We recommend to use Filter Unit and gabion together at the place like in the water, where work with gabion is difficult.

 